Transportation


Distributed measurement systems for train tests

Trains require many measurements during the development phase, inital measurements when they are placed into operation and repetitive measurements for determining the quality of the tracks.

Distributed measurement

A variety of sensors and signals are captured. Temperature, vibration, voltage and current (e-power), pressure, strain gauges, on the chassis or suspension are only a small insight.

Solutions with several TRIONet systems enable a measurement engineer to distribute channels over a long distance within one train or even between two trains.

  • Distributed measurement channels over long distances
  • Video and high-speed video capture
  • E-power, combustion power
  • GPS based speed and position tracking
  • Time synced measurements between two trains (pass-by)


Recommended products


Power Analyzers

All-In One Systems

Mainframes

Oxygen Software

Signal Conditioning


PU[REC] Datalogger/Data Recorder

Sensors